AI Compliance Matrix

Intelligent requirement mapping, gap analysis, and evidence tracking

--%
Overall Compliance
--
Requirements
--
Expiring Soon
--
Safety Score (EMR)
In Progress
FILTER:

Requirement Compliance Matrix

REQ ID REQUIREMENT CATEGORY STATUS AI CONFIDENCE EVIDENCE GAP RISK ACTIONS
REQ-001 System shall implement FedRAMP High baseline security controls Security
Compliant
96% confident
SSP v3.2 ATO Letter
None
REQ-002 Contractor shall provide 24/7/365 technical support with 15-minute response SLA Operational
Partial
78% confident
SLA Doc
Medium
REQ-003 All data must be encrypted at rest using AES-256 and in transit using TLS 1.3 Technical
Compliant
99% confident
Tech Spec Audit
None
REQ-004 System must maintain 99.99% uptime SLA with documented DR/BC procedures Operational
Non-Compliant
91% confident
Missing
Critical
REQ-005 Contractor must hold ISO 27001 and SOC 2 Type II certifications Regulatory
Compliant
100% confident
ISO Cert SOC 2
None
REQ-006 Solution must integrate with existing SAP ERP and Salesforce CRM systems Technical
Partial
72% confident
API Docs
High
REQ-007 Contract value not to exceed $4.5M over 5-year period of performance Financial
Compliant
95% confident
Cost Model Pricing
None
REQ-008 Offeror must demonstrate minimum 3 similar past performance references within last 5 years Legal
Pending Review
45% - needs data
Gathering
TBD

Compliance Score

87%
Compliant
Technical
92%
Security
96%
Financial
88%
Legal/Contractual
78%
Regulatory
85%

AI Gap Analysis

Critical Gap Detected
REQ-004 requires 99.99% uptime but current infrastructure only supports 99.9%. Recommend cloud architecture upgrade with multi-region failover.
Integration Risk
SAP integration (REQ-006) requires custom middleware. Similar past project took 3 months - ensure timeline accounts for this.
Strength Identified
Security compliance (FedRAMP, ISO, SOC 2) is a key differentiator. Recommend highlighting this prominently in executive summary.

Compliance Risk Heatmap

1
2
3
5
8
1
3
4
6
9
2
4
5
8
10
3
5
7
9
12
4
6
8
10
15
Low Impact High Impact
Y-axis: Likelihood | X-axis: Impact

Quick Actions

Evidence Documents

System Security Plan v3.2
"The system implements all FedRAMP High baseline controls as documented in NIST SP 800-53 Rev 5. Continuous monitoring is performed through automated scanning tools with real-time alerting..."
Page 45-47 Relevance: 98%
ATO Authorization Letter
"This letter confirms that [System Name] has been granted an Authorization to Operate (ATO) at the FedRAMP High impact level, effective [Date]..."
Full Document Relevance: 100%
POA&M Status Report
"Current POA&M items: 3 Low, 1 Medium. All items have documented remediation plans with completion dates within the next 90 days..."
Section 4.2 Relevance: 87%

Processing...

Upgrade Your Plan
You've reached the limit of your current plan.